Apply to the vacancy...
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Apply to the vacancy...
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Sign up for Jobbird
An error occurred while opening the sign-up page. Please try again.

Loading window...

Forgot my password
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Log out
Unfortunately, something went wrong while signing out. Please try again.

Loading window...

Job application sent
Something went wrong while logging in. Please try again.
Something went wrong while signing up. Please try again.

Loading window...

logo
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
Filters
Filters
Location and distance
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
Jobs posted from
Salary from (per month)
Filters
How our sorting works

The order in which job vacancies are displayed is determined by a composite score based on the following factors:

  • Keyword Relevance: How well your search terms match the vacancy details. We prioritize matches found in the job title, followed by job requirements, location names, and educational levels. Matches within general employer information or the organization's name carry a lower weight.
  • Commercial Prioritization (Premium Jobs): Vacancies paid for by employers ('Premium' or 'Sponsored') receive a ranking boost and will appear higher in the search results.
  • Recency (Date Relevance): Newer vacancies are prioritized. The relevance score of a vacancy is reduced by half once the posting is older than 30 days.
  • Proximity (Distance Relevance): Vacancies located closer to your search location are ranked higher. For vacancies located more than 30 km from the search center, the relevance score is halved.
The final ranking is established by multiplying all these individual factors to calculate the total relevance score.

Future Engineering Recruitment Ltd

Project Director - Data Centre Construction

Future Engineering Recruitment Ltd Cardiff
138,118 to 172,648
32 - 40 hour


Show Recently closed jobs

    Future Engineering Recruitment Ltd

    Project Director - Data Centre Construction

    Future Engineering Recruitment Ltd Cardiff
    138,118 to 172,648
    32 - 40 hour
    Status Open
    Apply now

    Apply on the employer's website


    What we ask

    Education

    No minimum education required

    What we offer

    Salary
    £138,118 to £172,648
    Hours
    32 to 40 hours per week
    Employment type
    permanent

    Job description

    Project Director - Data Centre Construction

    Norway

    €160,000 - €200,000 + Accommodation + Travel Allowance + Bonus + Package + Career Progression + Immediate Start Available

    This is a rare opportunity for an experienced Project Director to join a fast-growing international contractor delivering large-scale mission-critical projects across Europe. You'll take full ownership of a major data centre project in Germany, leading delivery from early-stage design coordination through to commissioning and handover on a technically challenging, high-value build.

    The business is known for delivering projects at speed through an integrated delivery model across CSA and MEP, giving Project Directors real control over programme, sequencing, and decision-making. This role will suit a driven construction leader who thrives in fast-paced environments and wants to play a key role in the continued growth of a major international contractor.

    The ideal candidate will have successfully delivered a full lifecycle data centre, warehouse, logistics, or other large-scale industrial project from pre-construction through to final handover and commissioning.

    The Role as a Project Director Will Include:

    Leading the full lifecycle delivery of a large-scale data centre project in Germany
    Taking full responsibility as the number one on site across CSA, MEP, programme, commercial, and client management
    Driving programme performance and managing aggressive construction timelines in a fast-track environment
    Overseeing all phases from early-stage design coordination through procurement, construction, commissioning, and handover

    The Successful Project Director Will Have:

    Proven experience delivering a full lifecycle data centre, warehouse, logistics, or mission-critical project from start to finish
    Strong background operating as a Project Director or Senior Project Manager on large-scale construction projects
    Experience managing complex CSA and MEP packages simultaneouslyKeywords: Construction Director, Project Director, Data centres, Life Science, Hospitals, large-scale construction, Nordics, Norway, Skien, London, Manchester
    Salary description

    £138118.00 - £172648.00 per year

    Apply now

    Apply on the employer's website

    Apply now

    Apply on the employer's website


    Vacancy actions

    Save as favorite
    Share vacancy
    Or apply later


    Cardiff Wales

    Jobs

    • Search for jobs
    • Jobs per location
    • Jobs per job profession
    • Jobs per employment
    • Jobs per educational attainment

    Jobbird

    • Switch to different region
    • Terms and Conditions
    © 2026 Jobbird