Apply to the vacancy...
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Apply to the vacancy...
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Sign up for Jobbird
An error occurred while opening the sign-up page. Please try again.

Loading window...

Forgot my password
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Log out
Unfortunately, something went wrong while signing out. Please try again.

Loading window...

Job application sent
Something went wrong while logging in. Please try again.
Something went wrong while signing up. Please try again.

Loading window...

logo
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
Filters
Filters
Location and distance
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
Jobs posted from
Salary from (per month)
Filters
How our sorting works

The order in which job vacancies are displayed is determined by a composite score based on the following factors:

  • Keyword Relevance: How well your search terms match the vacancy details. We prioritize matches found in the job title, followed by job requirements, location names, and educational levels. Matches within general employer information or the organization's name carry a lower weight.
  • Commercial Prioritization (Premium Jobs): Vacancies paid for by employers ('Premium' or 'Sponsored') receive a ranking boost and will appear higher in the search results.
  • Recency (Date Relevance): Newer vacancies are prioritized. The relevance score of a vacancy is reduced by half once the posting is older than 30 days.
  • Proximity (Distance Relevance): Vacancies located closer to your search location are ranked higher. For vacancies located more than 30 km from the search center, the relevance score is halved.
The final ranking is established by multiplying all these individual factors to calculate the total relevance score.

Anderson Wright Consulting

Technical Director - Hyperscale Data Centre Construction & Development

Anderson Wright Consulting Regent's Park
170,000 to 200,000
32 - 40 hour


Show Recently closed jobs

    Anderson Wright Consulting

    Technical Director - Hyperscale Data Centre Construction & Development

    Anderson Wright Consulting Regent's Park
    170,000 to 200,000
    32 - 40 hour
    Status Open
    Apply now

    Apply on the employer's website


    What we ask

    Education

    No minimum education required

    What we offer

    Salary
    £170,000 to £200,000
    Hours
    32 to 40 hours per week
    Employment type
    permanent

    Job description

    Technical Director, Construction – EMEA (Data Centres)

    Location: Frankfurt, London, Paris, or other EMEA locations as required

    As part of our clients continued expansion across EMEA, they are now seeking an experienced Technical Director, Construction to provide technical leadership across the delivery of hyperscale and mission-critical data centre developments.

    This is a senior owner-side role responsible for ensuring the successful execution of data centre projects from design and pre-construction through construction, commissioning, and operational handover. The successful candidate will serve as the technical authority during construction, working closely with General Contractors, consultants, commissioning teams, and internal stakeholders to ensure projects are delivered safely, efficiently, and in accordance with design intent, quality standards, and operational requirements.

    This is a highly site-focused role, with the majority of time spent on active construction sites across EMEA providing hands-on mechanical and electrical technical leadership and oversight.

    The candidate MUST have hands on site, ground up experience with the key responsibilities and MUST meet the requirements detailed below.

    Key Responsibilities

    Act as the owner's technical authority during construction, ensuring compliance with Basis of Design (BoD), technical specifications, and contractual requirements.
    Lead technical reviews of construction-stage deliverables, RFIs, shop drawings, and material submittals.
    Provide constructability expertise during pre-construction, including sequencing, logistics, temporary works, and risk mitigation.
    Oversee quality assurance and QA/QC processes across Civil, Structural, Architectural, Mechanical, Electrical, Controls, and Life Safety systems.
    Provide technical leadership for critical electrical, mechanical, controls, and BMS systems within hyperscale data centre environments.
    Support General Contractors and project teams in resolving technical challenges and driving successful project execution.
    Coordinate commissioning activities, Integrated Systems Testing (IST), operational readiness, and final handover.
    Act as the primary technical interface with consultants, contractors, vendors, commissioning agents, and authorities.
    Drive standardization, continuous improvement, and value engineering initiatives across the EMEA portfolio.
    Requirements

    10+ years' experience delivering data centre, mission-critical, or large-scale infrastructure projects.
    Extensive hyperscale, colocation, or mission-critical data centre experience is essential.
    Proven ground-up construction experience.
    Strong electrical and mechanical systems background.
    Experience across the full project lifecycle including design, pre-construction, construction, commissioning, and operational handover.
    Experience working directly with General Contractors, trade contractors, consultants, and commissioning teams.
    Strong understanding of data centre design, construction methodologies, commissioning, and operational requirements.
    Knowledge of EMEA building codes, electrical and mechanical standards, and health & safety regulations.
    Degree in Engineering, Construction, Architecture, or a related discipline.
    Business-fluent English required; German is highly desirable.
    This is an outstanding opportunity to join a rapidly growing organisation at the forefront of digital infrastructure development, delivering some of the most advanced data centre projects across the EMEA region.

    #DataCenters #Hyperscale #MissionCritical #ConstructionLeadership #TechnicalDirector #MEP #Commissioning #DigitalInfrastructure #OwnerSideConstruction #EMEAJobs
    Salary description

    £170000.00 - £200000.00 per year

    Apply now

    Apply on the employer's website

    Apply now

    Apply on the employer's website


    Vacancy actions

    Save as favorite
    Share vacancy
    Or apply later


    Regent's Park England

    Jobs

    • Search for jobs
    • Jobs per location
    • Jobs per job profession
    • Jobs per employment
    • Jobs per educational attainment

    Jobbird

    • Switch to different region
    • Terms and Conditions
    © 2026 Jobbird