Apply to the vacancy...
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Apply to the vacancy...
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Sign up for Jobbird
An error occurred while opening the sign-up page. Please try again.

Loading window...

Forgot my password
Unfortunately, something went wrong while opening the page. Please try again.

Loading window...

Log out
Unfortunately, something went wrong while signing out. Please try again.

Loading window...

Job application sent
Something went wrong while logging in. Please try again.
Something went wrong while signing up. Please try again.

Loading window...

logo
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
Filters
Filters
Location and distance
  • 5 km
  • 10 km
  • 30 km
  • 50 km

  • All
Jobs posted from
Salary from (per month)
Filters
How our sorting works

The order in which job vacancies are displayed is determined by a composite score based on the following factors:

  • Keyword Relevance: How well your search terms match the vacancy details. We prioritize matches found in the job title, followed by job requirements, location names, and educational levels. Matches within general employer information or the organization's name carry a lower weight.
  • Commercial Prioritization (Premium Jobs): Vacancies paid for by employers ('Premium' or 'Sponsored') receive a ranking boost and will appear higher in the search results.
  • Recency (Date Relevance): Newer vacancies are prioritized. The relevance score of a vacancy is reduced by half once the posting is older than 30 days.
  • Proximity (Distance Relevance): Vacancies located closer to your search location are ranked higher. For vacancies located more than 30 km from the search center, the relevance score is halved.
The final ranking is established by multiplying all these individual factors to calculate the total relevance score.

FERROVIAL CONSTRUCTION (UK) LIMITED

Temporary Works Manager

FERROVIAL CONSTRUCTION (UK) LIMITED Birmingham
32 - 40 hour


Show Recently closed jobs

    FERROVIAL CONSTRUCTION (UK) LIMITED

    Temporary Works Manager

    FERROVIAL CONSTRUCTION (UK) LIMITED Birmingham
    32 - 40 hour
    Status Open
    Apply now

    Apply on the employer's website


    What we ask

    Education

    No minimum education required

    What we offer

    Hours
    32 to 40 hours per week
    Employment type
    permanent

    Job description

    Temporary Works Manager

    Location: Lot 3 Track north - Birmingham

    The Project

    HS2 has appointed Ferrovial Construction / BAM Nuttall JV (FBJV) for contracts totaling almost 140 miles of track between London and the West Midlands. Ferrovial BAM will oversee the design and construction of the HS2 track infrastructure, manage construction logistics and support the testing and commissioning phase.

    The Role

    We are seeking a Temporary Works Manager to join the HS2 Track infrastructure project in Birmingham during its initial design phase, running alongside the completion of the main works contracts, which is currently at their busiest stage.

    Works include but are not limited to a large Infrastructure and temporary railheads. The Temporary Works Manager will lead the design of the temporary railheads and all related temporary works for the designated section of Lot 3, ensuring compliance with HS2 standards, contractual requirements, and safety regulations.

    This role involves managing interfaces with civil works, coordinating with designers and suppliers (including slab track and switches and crossings), and overseeing input from internal Ferrovial BAM JV teams such as construction, environmental, and consents.

    Key responsibilities

    * Overall responsibility for ensuring that all temporary works are undertaken in accordance with the correct process, the appropriate standards and the scheme design.

    * Overall responsibility for ensuring the Temporary works are constructed in accordance with the design, the relevant drawings and specifications.

    * To be the first point of contact between the designer and the site team for all temporary works matters.

    * To ensure that those responsible for the on-site temporary works management/supervision have received the appropriate level of training.

    * Responsible through the lead TWC for ensuring that subcontractors managing, controlling and constructing temporary works have appropriate and adequate procedures.

    * Maintain all training records and documentation relating to TWC/TWS appointments across the project.

    * Co-ordination of temporary works between the site teams, TW designers, permanent works designers, external stakeholders and other key interfaces.

    * To ensure that design competency checks are undertaken in accordance with CDM regulations.

    * Take part in specific production meetings where required.

    * Design, Project Delivery & Planning

    * Develop and maintain detailed delivery programmes for TW design.

    * Ensure alignment with HS2 Works Information and technical specifications Stakeholder & Interface Management

    * Coordinate with civil engineering teams, signalling, and other railway systems contractors.

    * Manage internal interfaces at boundaries.

    * Supply Chain Coordination

    * Oversee procurement and logistics for execution of the TW designs.

    * Health, Safety & CDM Compliance

    * Implement CDM roles, inductions, and security protocols for all works.

    * Quality Assurance

    * Ensure compliance with design obligations and integrate supplier O&M manuals into project documentation.

    Key skills and experience

    * Degree qualification in civil engineering or equivalent.

    * Extensive experience in design and/or engineering management, temporary works, instrumentation and monitoring, and proven track record of delivery of large infrastructure project preferably in rail projects

    * Chartered Civil or Structural Engineer preferred experience.

    * Experience of working in a railway environment preferred, but not essential

    * Proven experience managing TW large-scale infrastructure projects.

    * Strong understanding of railway technical standards and Works Information requirements.

    * Ability to manage complex interfaces and multi-disciplinary teams.

    * Experience of working in a cost-conscious environment

    * Good people management experience

    * Experience in managing designers

    Desirable skills

    Understanding of High Speed technical standards and Works Information requirements.

    Competence in digital project management tools and BIM integration.

    Negotiation and stakeholder engagement skills for procurement processes

    Please note that this job description does not represent a comprehensive list of activities and employees may be requested to undertake other reasonable duties.

    Location: This position requires full-time availability at the JV offices in Birmingham
    Apply now

    Apply on the employer's website

    Apply now

    Apply on the employer's website


    Vacancy actions

    Save as favorite
    Share vacancy
    Or apply later


    Birmingham England

    Jobs

    • Search for jobs
    • Jobs per location
    • Jobs per job profession
    • Jobs per employment
    • Jobs per educational attainment

    Jobbird

    • Switch to different region
    • Terms and Conditions
    © 2026 Jobbird